Marine Engineering
Red Sea Gateway Terminal Civil Works, Jeddah, Saudi Arabia
source: Author: 2015-01-22 Date: 2020-05-14 Font size: [large medium small]
The project is mainly constituted by two 100,000-ton main berths, one 50,000-ton feeder berth as well as berth base trough and basin channel dredging part, among which the total length of main berth is 735m and that of the feeder berth is 317.275m.
XML 地图 | Sitemap 地图