Marine Engineering
Proposed Docks, Wharves, Quays, Piers and Other Ancillary Works In New Yard (Phase 1) at Tuas South, Singapore for M/S Jurong Shipyard Pte Ltd
source: Author: 2015-01-22 Date: 2020-05-14 Font size: [large medium small]
 


Scope of works involves the design and construction of 4 dry docks(1#410m*66m、2#、3#350m*66m,4#360m*89m), 4 wharves (total length 1870m), 3 piers (318m*25m), 2 quays (total length 688m)and other ancillary works such as pump houses, pump control room and winch control room
XML 地图 | Sitemap 地图